|
|
|
|
Basement
Framing
(Looking Soutwest)
(November 16, 2002)
|
Setting
the Garage Beam
(Looking Southeast)
(November 16, 2002)
|
|
Click
on a picture for a larger view.
|
|
|
|
|
Still
Setting the Garage Beam
(Another View)
(November 16, 2002)
|
Framing
Beginning on the Upstairs.
(Looking East at the Front)
(November 22, 2002)
|
|
Click
on a picture for a larger view.
|
|
|
|
|
The
Outside Walls are Done
(Looking East at the Front)
(November 22, 2002)
|
The
Outside Walls are Done
(Looking West at the Back)
(November 22, 2002)
|
|
Click
on a picture for a larger view.
|
|
|
|
|
Abby
& Sam Looking Out of Their Future Bedroom
Windows
(November
22, 2002)
|
Jenny
and the Kids Looking Out of one of the Master
Bedroom Windows.
(November
22, 2002)
|
Click
on a picture for a larger view.
|
|
|
|
|
Main
Floor Framing
(November 25, 2002)
|
Looking
Down the Hallway
(November 25, 2002)
|
Click
on a picture for a larger view.
|
|
|
|
|
Jenny,
Abby and Sam
in the Dining Room
(November 25, 2002)
|
The
Trusses are in Place
(December 4, 2002)
|
Click
on a picture for a larger view.
|
|
|
|
|
The
Kids on the
Porch on Truss Day
(December 4, 2002)
|
|
Click
on a picture for a larger view.
|
| |
|